July 15, 2019 at 1:19 p.m.

INDOT: Work begins on State Road 9 today


By Indiana Department of Transportation-

Press Release

Indiana Department of Transportation maintenance crews will begin chip sealing two sections of State Road 9 in Bartholomew County, on or after Monday, July 15, weather permitting.

Chip seal will take place on a four-mile section of State Road 9, from State Road 46 to 4.17 miles north of State Road 46 (near Shaefer Drive, south of Hope), and a three-mile section, from 5.58 miles north of State Road 46 (near Angling Road) to 8.63 miles north of State Road 46 (near County Line Road).

Motorists should expect delays in the area due to lane closures in the work zone. Flaggers will be present to manage traffic.

Chip sealing coats existing pavement with liquid asphalt, sealing cracks and providing waterproof protection. This extends the service life of the roadway and lowers maintenance costs. Small chips of limestone are used to cover the asphalt, preventing it from spraying vehicles or sticking to tires. The chips also restore surface friction for improved skid resistance, maneuverability, and driver safety. Chip seal is a cost-effective pavement  preservation technique, saving $6 to $14 in taxpayer expenditures for every $1 invested in extending the life of a roadway.

HOPE