November 9, 2021
Curb Work on the Square
Stories this photo appears in:
Curb Work on the Square
The west side of the square bordering the park is blocked off for curb work. The town is installing a curb and a green space on the west side of the square to stop large trucks from backing in and blocking the sidewalks. The curb and sidewalk in front of Swiss Maid are also being replaced due to faulty concrete. Please use caution in these areas as the concrete and asphalt are being cut and installed.
You must login to comment.